This was to accommodate the escalator pits as well as the high loads from the escalator. I have checked this with the designers. As we do not have full details from the manufacturer we will now increase the shear reinforcement to cater for the high point load. We will amend this with higher shear ligatures.
As for the pits, then the escalator manufacturer would have to accommodate this within his design. Please ensure this is well coordinated.