My real concern is that if our technical design drawings are being changed relentlessly, we are unable to take further responsibility on this. Please refrain from doing this as these are engineering matters and should not be altered relentlessly before our designers go through.
I have tried to quicken the response by getting you to verify that those bars are able to be installed by your construction team as we see it could cause congestion and not to get you to change our drawings. I have already get my designers to amend those to comply with the comments although we do not require this.