As I can’t sure whether there are any different site condition between the panel damage time and pass half year, so I am worry the panel may again damage due to the panel’s rigidity has be effect already even outlook has repair.
If possible site people can help make up some reinforce job from inside panel before system operation for safety, please reference my attach hand drawing, the red line portion need 4” C channel steel as support !